How tall will Dominion Energy build the emission stacks?

Dominion Energy plans to build a compressor station directly across the Potomac River from Mount Vernon. While they claim the emission stacks will only be 50 feet tall Dominion Energy has submitted very conflicting data to the Maryland Department of Energy and the Federal Energy Regulatory Commission. 

Stack Heights from Dominion Energy's Permits

November 2016

Air Permit to Construct Application Dominion Cove Point LNG, LP, Charles Compressor Station, Eastern Market Access Project Dominion to MDE, 9 November 2016

Section 4.2.3 Good Engineering Practice Stack Height, Page 4-5 (PDF page 27)

The maximum calculated GEP stack height for the new emissions sources is 83 feet; the controlling structure is the proposed compressor building (33 feet).


Section 4.4.1 Emission Rates and Exhaust Parameters, Pages 4-5 through 4-9 (PDF pages 27-31)

Read the entire document

November 2016

Federal Energy Regulatory Commission Documents, Abbreviated Application for a Certificate of Public Convenience and Necessity 15 NOVEMBER 2016

3-4 through 3-5 (PDF page 1033-1034)

The maximum calculated GEP stack height for the new emissions sources is 83 feet; the controlling structure is the proposed compressor building (33 feet).

Read the entire document

November 2016

Dominion Cove Point LNG, LP, Eastern Market Access Project, Docket No. CP17-_______-000
Resource Report 9, Air and Noise Quality
NOVEMBER 2016

Page 3-5 (PDF page 175)

The maximum calculated GEP stack height for the new emission sources is 83 feet; the controlling structure is the proposed compressor building (33 feet).

Read the entire document

January 2018

Federal Energy Regulatory Commission Order Issuing Certificate 23 JANUARY 2018

Page 50

114. Theresa Lazar states that air will be trapped near her home due to a 100-foot-high hill to the east of the Charles Station. But the station site is not surrounded by hills that would trap air within a low valley. Also, the compressor units at the Charles Station will discharge exhaust at a minimum speed of 15.84 meters per second from stacks reaching 83 feet above ground level.200

Citation 200: Application, Res. Report 9, app. 9-C at 3-5 (stack height), 3-8 tbl.3-2 (Stack Parameters and Emission Rates).

Read the entire document

March 2018

Supplement A to Docket #24-16 Dominion Energy Cove Point LNG, LP – Charles Station Dominion to MDE, 09 March 2018

This packet includes: Dominion Cove Point LNG, LP, Charles Compressor Station, Eastern Market Access Project Revision 2 – FEBRUARY 2018

Tables 4-2 and 4-3 (pictured above) show the stack height at 15.24 meters or 50 feet.

Section 4.2.3 Good Engineering Practice Stack Height, Page 4-5 (PDF page 63)

The maximum calculated GEP stack height for the new emissions sources is 113.5 feet; the controlling structure is the proposed compressor building (45.4 feet).

Read the entire document

March 2018

Supplement B to Docket #24-16 Dominion Energy Cove Point LNG, LP – Charles Station Dominion to MDE, 15 March 2018

This packet includes: Dominion Cove Point LNG, LP, Charles Compressor Station, Eastern Market Access Project Revision 1 – APRIL 2017

Dominion Cove Point LNG, LP, Charles Compressor Station, Eastern Market Access Project Revision 2 – FEBRUARY 2018

Tables 4-2 and 4-3 (pictured above) show the stack height to be 15.24 meters or 50 feet.

Section 4.2.3 Good Engineering Practice Stack Height, Page 4-5 (PDF page 63)

The maximum calculated GEP stack height for the new emissions sources is 113.5 feet; the controlling structure is the proposed compressor building (45.4 feet).

 

Read the entire document