Reconstruction

We hope you enjoy watching the construction progress at George Washington's Distillery.  We will continue to add new photos until the building is rebuilt. To learn more about the reconstruction, please visit Distilling the Past, our Interactive Dig hosted by Archaeology Magazine.

 
filming distilling
The History Channel visits the distillery in mid-January to film a short movie, which will be shown on the second floor when the reconstruction opens in April.
 
carting grain
Interpreters reenact carting away barrels of whiskey for the filming.

 

 

 

 

 

 

 

 

 

 
snow
The first snow of the season!
 
trough
The water flows from the millrace, down the wooden trough, and into the distillery where it feeds the worm tubs.
 

 

 

 

 

 

 

 

 

 


 
water trough
Finishing touches are added to bring the reconstructed distillery to life.
 
 
trough feeds stills
The trough leads into the building and feeds water to the five stills.

 

 

 
 
water trough
This wooden trough brings water from the millrace into the distillery.

 


 

 
 
whiskey barrel
The top of a whiskey barrel.
 
stills, furnace, worm tubs
The stills, furnaces, and worm tubs are installed.

 

 

 

 

 

 

 

 

 
 
whiskey barrels on stone floor
The stone flooring is done and the mash tubs are set out.
 
dedication of the building
In September 2006, the whiskey distillery was dedicated.

 

 

  

 

 

 


 
cobble floor
Laying the cobble floor where mashing and fermenting will take place.
 
east facade
East facade of the distillery.

 

 

 

 

 

 
distillery roof
The roof is completed, September 7.

  


 
 
Roof
It’s August and the roof is going up!
           
 
Roof close up
Close up of the roof on the east façade.

 

 

 

 

 

 

 
Roof
More progress on the roof.

    

 
Roof close up
Close up of the roof on the west façade.
         
 
Roof and loft
Working on the roof and loft space.

 

 

 

 

 

 

  
 
Furnaces and floor
The floor gets put in around the furnaces.
          
 
Furnace
Close up of the furnace.

 

 

 

 

 

 

   


 
 
chimneys
Two chimneys are almost done the last week of May.
  
 
well
Volunteer Tom Greer was a huge help working on the well.

 

 

 

 

 

 


 
5 stills
Placement of the five stills begins early April.

 

 
stills
Bricking two copper pot stills into the southern furnace.
 
 
stills
Stills bricked into furnace.

 

 

 

 

 


 
 
front door
The door into the still room.
       
 
still furnace
Constructed began on the still furnaces now that the walls are finished, March 10.

 

 

 

 

 

 


 
elevator shaft
The week of Feb. 8 the eleavator shaft was built.
      
 
elevator shaft
The elevator shaft will be hidden under the roof.

 

 

 

 

 

 


 
four walls
The distillery walls are almost complete Feb. 3.
    
 
four walls
The four walls of the distillery from the gristmill.

 

 

 

 

 

 


 
west wall
The west wall has two windows.
     
 
addition
The addition will house stairs and an elevator, Jan. 19.

 

 

 

 

 

 


 
south wall
Sam working on the southern wall.
     
 
partition wall
The partition wall, Jan. 10.

 

 

 

 

 

 
door
Esther looking out the door to the distillery.
   
 
east wall
The masons on the east wall, Jan. 10.

 

 

 

 

 

 


 
from mill
The distillery from Washington's gristmill, Dec. 22.
   
 
store room door
The door to the office and store room.

 

 

 

 

 


 
office door
Setting the door to the office and store room, Dec. 14.

 

 
door frame
The frame for the door to the still room.
  
 
partition wall
The wall between the main room and the store room is almost complete, Dec. 14

 

 

 

 

 

 


 
store room
The masons opened the tent sides due to the balmy weather Nov. 28.
  
 
west wall
The west wall, Nov. 28.

 

 

 

 

 


 
tent
The masons erected a tent to continue their work into the winter.
   
 
inside tent
Inside the tent, work continues on the store room walls, Nov. 21.

 

 

 

 

 

 


 
store room
The masons building the whiskey store room and office, Nov. 14.
      
 
addition
An addition, housing stairs and elevator, is constructed of concrete block with a stone facing.

 

 

 

 

 


 
store room
Building the store room and office, Nov. 8.
        
 
concrete prep
Preparing to pour concrete around the boiler, Nov. 8.

 

 

 

 

 

 

 


 
archaeology
Limited archaeological excavation for the water system began in October.

 
south wall
The south wall is finished, Nov. 1.
   
 
south wall hole
Water to cool the worm tubs will enter the building through this hole.

 

 

 

 

 

 

 

 


 
still foundations
October 17, the south wall was the focus.

 

 
covered cornerstone
The cornerstone is covered to protect it as the wall grows taller.
   
 
south wall
The masons worked on the south wall this week.

 

 

 

 

 

 


 
southern wall
October 6, the southern wall is almost halfway done.
        
 
southwest corner
The southeast corner grew several courses taller the week after the cornerstone was placed.

 

 

 

 

 

 


 
partition wall
The masons worked on the partition between the main room and the store room, 28 September.

 

 
covered cornerstone
The cornerstone of the distillery was unveiled 28 September.
       
 
Dennis and GW
Dennis and friend show off the new cornerstone.

 

 

 

 

 

 


 
construction and race
The distillery viewed from Washington's Gristmill, September 23.

 

 
sw corner
The southwest corner, September 23.
   
 
still foundations
By September 23, the foundations for the still furnaces and boiler were laid.

 

 

 

 

 

 


 
west wall
This week, September 16, almost all the west wall is finished.
   

 

 
southwest corner
The masons fit each rock into place like a giant jigsaw puzzle.
          
 
southwest corner
The west wall is almost finished, the south wall much lower, September 16.

 

 

 

 

 

 


 

 
sw corner
September 9, the southwest corner takes shape.
        
 
west wall
The west wall on September 9, 2005.

 

 

 

 

 


 

 
west wall
The west wall, with gristmill in the background, August 24.

 

 
west wall
Facing west, August 24.
   
 
A window is created, August 24.

 

 

 

 

 

 

 

 
west wall
A window on the west wall, August 24.
  
 
masonry
Eleanor shows off the masonry.

 

 

 

 

 

 

 


The Masons began work in mid-July. 

 
southwest corner
The southwest corner takes shape, July 21.
     
 
south wall
The distillery's south wall, July 21.

 

 

 

 

 

 

 
southwest corner
The southwest corner rises from the ground, July 21.
    

 

 